LAX/LGB are seeing record volumes that challenge the existing port infrastructure

Time:2022-06-08  Source:Original website  Popularity:638

Both ports are seeing record volumes that challenge the existing portinfrastructure.  

All terminal gates arerunning as published and in line with Pier Pass program. 


Port of LAX dwelltimes for import cargo at 4.2 days, down from 11 days peak. On-dock rail at 6.7days. Down from 13.4 days peak. 

Overall volume of on-dock rail departures is 27,936 units. 14,681 units nine days and over. Import units on street isaveraging 8.6 days.